Operations center
Section Controller
Live Delay Propagation SimulationSimulating synthetic network disruptions and observing downstream non-linear delay ripples
Target:#12004 Swarna Shatabdi
Pre-configured Simulation Scenarios
Operational Parameters
Latency: <5msPreceding Freight Delay (m)
Weather Disruption
Visibility Speed Cap (kph):
Train Precedence & Overtake HoldLoop #12004 for VIP #22436
Caution Order TSR (30kph)Track block KM 118 – 122
Simulated Final ETA
02:16 PM
+64m drift
Ripple Index
1 / 1.0
Critical Risk
Net Route Delay
+106m
Total vs Timetable
Non-Linear Delay Curve
Baseline AI Simulated
Downstream Arrival Times
| Node | Baseline ETA | Simulated ETA | Added Drift |
|---|---|---|---|
TDL Loop Line Hold for #22436 | 09:28 AM (+40m) | 10:06 AM | +38m |
CNB Yard reception platform clearance conflict | 11:32 AM (+32m) | 12:26 PM | +54m |
LKO Terminal platform occupancy cascade | 01:12 PM (+42m) | 02:16 PM | +64m |